1, carefully read the product manual before installation, check whether the product meets the requirements of use, remember the installation points, and make preparations.
2, pay attention to the cleanliness of the medium, if the medium is mixed with dirt, impurities and other obstacles to the normal work of the solenoid valve, the pipeline should be installed with a filter valve screen ≥60 mesh.
3, the solenoid valve should not be installed in the low recess of the pipeline, installed in the discharge pipe of the container, pay attention to not from the bottom of the container, but should be installed in the bottom of the container slightly above the position.
4, if the medium will be water hammer phenomenon, then should choose a waterproof hammer function of the solenoid valve or take appropriate preventive measures.
5, the inlet side of the steam solenoid valve should be equipped with a trap, where the nozzle should be tilted.
6, check whether the parameters marked on the nameplate are consistent with the parameters of the selected product, the power supply voltage should meet the rated voltage fluctuation range: AC +10%~-15%, DC +10%~-10%, usually coil components should not be disassembled.
7, before the solenoid valve takeover, use 0.3MPa pressure to flush the pipeline, remove the metal powder and sealing material residue in the pipeline, rust and scale.
8, the solenoid valve is generally oriented, can not be installed in reverse, usually in the valve body with "→" indicates the direction of the medium flow, installation should be installed in accordance with the direction of "→" indicated, but the company may sometimes in the vacuum pipe or special circumstances there will be a proposal to install except.
9, to confirm, the solenoid valve itself and its connection with the nozzle whether there is leakage.
10, the connection of the coil lead line should be checked, especially in the case of three lead lines.
11, electrical components connected to the solenoid valve, such as relays, switches and contactors. The contact should not vibrate when opening the valve, otherwise the work will be unreliable and affect its solenoid valve life.
12, the electrical circuit to access the corresponding insurance line, as the protection of the electrical circuit.
13, the installation of the solenoid valve should have a certain reserved space for daily maintenance and regular maintenance.
14, the installation with a wrench or pipe pliers to fix the valve body, and then screw on the nozzle, do not force on the electromagnetic coil assembly and cause deformation, so that the solenoid valve is difficult to work normally.
15, in the case of insufficient pipeline rigidity, or water hammer phenomenon, please fix the valve before and after the nozzle with a support.
16, when used in frozen places, it is necessary to protect the pipeline with thermal insulation materials or set a heater on the pipeline.
17, installation position: the solenoid parts of the general solenoid valve should be vertically upward, vertically installed in the pipeline at the level of the ground, if by space restrictions or working conditions must be based on the side of the building sewer pipe or inverted installation, please put forward in the selection of orders. Some products have special regulations, please follow the instructions to install.
18, pay attention to the takeover, sealing materials can not be used too much. For example, when threaded connection, the nozzle thread should be maintained within the effective length, and at the end of the half pitch with a file champhering, from the end of the 2 teeth began to wrap the sealing belt, otherwise excessive sealing belt or binder will enter the solenoid valve cavity, and prevent the normal operation of the accident.